WisDOT Construction Testing & Quality Assurance Services


CGC Inc. is known for its construction testing, observation and Quality Assurance management provided to the Wisconsin Department of Transportation (WisDOT) as documented by the WisDOT Roster of Eligible Engineering Consultants. The State of Wisconsin has recognized CGC, Inc. as qualified to do so since the inception of the WisDOT consultant program began in 1988.

 Southeast Region

Kenosha, Milwaukee, Ozaukee, Racine, Walworth, Washington and Waukesha counties.

 Racine County

Racine: 21st Street

WisDOT:  2703-06-70

Scope:      Reconstruction of ~1 mi of 21st street

Reconstruction of 21st Street occurred between Green Bay Road and Ohio Street. Improvements included removal of the existing four lane concrete roadway replaced with new 9" concrete pavement, common excavations, curb and gutters, storm sewers and traffic signals. Extensive coordination with businesses located on 21st street was conducted.

 Southwest Region

Columbia, Crawford, Dane, Dodge, Grant, Green, Iowa, Jefferson, Juneau, La Crosse, Lafayette, Monroe, Richland, Rock, Sauk and Vernon counties.

 Dane County

Madison: I-90/I-94 Interchange

WisDOT:  1010-00-75

Scope:      Construction of median concrete barrier wall from I-90/I-94 Interchange to County V

Excavated 28,000 yd3 soil, constructed 72,000 linear feet of concrete barrier wall, drainage upgrades and lining existing culvert pipes.

 Dane County

Madison: I-39

WisDOT:  1010-01-72, 1010-01-76

Scope:      Portage Road Bridge Overpass and Buckeye Road Bridge Overpass

Construction utilized ~975 yd3 concrete masonry; grading, base aggregates, concrete curb and gutter, street lighting and landscaping.

 Dane County

Madison: Todd Drive Interchange/South Madison Beltline

WisDOT:  1206-06-74, 1206-06-75

Scope:      Todd Drive Interchange/South Madison Beltline

Provided Construction Engineering staff for the $13 million of reconstruction over the 2 year period of construction 2006 to 2007 affecting roadway between Verona Road and Fish Hatchery Road. In 2006, the Todd Drive frontage roads were completely reconstructed and in 2007 the Beltline was base patched and paved with HMA E-10. The projects were staged to accommodate local businesses and Beltline commuters.

How WisDOT Selects Construction Testing Consultants

WisDOT uses its Roster of Eligible Engineering Consultants (opens in a new tab) to determine eligibility for construction and design engineering services contracts. Prime consultants must be on the Roster to submit Notices of Interest for those solicitations, the Roster lists registered firms alphabetically without ranking, and selection is qualification based (WisDOT consultant overview (opens in a new tab)). Recent materials testing solicitations have asked for knowledge of HTCP sampling and testing procedures, familiarity with AASHTO and WisDOT testing procedures and familiarity with laboratory equipment calibration (example solicitation (opens in a new tab); another (opens in a new tab)).

WisDOT Project Experience at a Glance

Selected CGC projects for the Wisconsin Department of Transportation
ProjectWisDOT project IDRegion and countyScope and quantities
Racine: 21st Street2703-06-70Southeast, RacineReconstruction of about 1 mile between Green Bay Road and Ohio Street; new 9-inch concrete pavement, curb and gutter, storm sewers, traffic signals
Madison: I-90/I-94 Interchange1010-00-75Southwest, DaneMedian concrete barrier wall to County V; 72,000 linear feet of barrier, 28,000 cubic yards excavated, culvert lining
Madison: I-391010-01-72, 1010-01-76Southwest, DanePortage Road and Buckeye Road bridge overpasses; about 975 cubic yards of concrete
Madison: Todd Drive Interchange / South Madison Beltline1206-06-74, 1206-06-75Southwest, DaneConstruction engineering staff for $13 million of reconstruction, 2006 to 2007, between Verona Road and Fish Hatchery Road

The WisDOT Rules This Work Is Performed Under

WisDOT’s 2025 Standard Specifications, section 701, require sampling and testing by HTCP-certified personnel at or above the levels in table 701-1 and laboratories qualified under the Wisconsin laboratory qualification program. Control charts plot the running average of the last four QC data points, and the department performs at least one verification test for every five contractor QC tests unless an individual QMP specifies otherwise (section 701 (opens in a new tab)).

Frequently Asked Questions About WisDOT Construction Testing

What is the WisDOT Roster of Eligible Engineering Consultants?

WisDOT uses the Roster to determine eligibility for its construction and design engineering services contracts. Prime consultants must be on the Roster to submit Notices of Interest for construction and design engineering solicitations. The Roster is an alphabetical listing of registered consultants without ranking, and WisDOT selects consultants by qualification. The State of Wisconsin has recognized CGC, Inc. as qualified since the WisDOT consultant program began in 1988.

What do WisDOT construction materials testing solicitations require of consultants?

Recent WisDOT solicitations for materials testing have asked for knowledge of Highway Technician Certification Program (HTCP) sampling and testing procedures, familiarity with AASHTO and WisDOT materials sampling and testing procedures, and familiarity with laboratory equipment calibration procedures.

Which WisDOT rules govern contractor quality control testing on these projects?

WisDOT's 2025 Standard Specifications, section 701, require sampling and testing by HTCP-certified personnel at or above the levels in table 701-1, and require commercial laboratories to be qualified under the Wisconsin laboratory qualification program. Control charts plot the running average of the last four QC data points, and the department performs at least one verification test for every five contractor QC tests unless a specific QMP says otherwise.

Which WisDOT regions does CGC list project work in?

This page lists project work in the Southeast Region (Kenosha, Milwaukee, Ozaukee, Racine, Walworth, Washington and Waukesha counties) and the Southwest Region (Columbia, Crawford, Dane, Dodge, Grant, Green, Iowa, Jefferson, Juneau, La Crosse, Lafayette, Monroe, Richland, Rock, Sauk and Vernon counties). CGC has facilities in Madison and West Allis.

What WisDOT projects has CGC supported?

Listed projects include the reconstruction of about one mile of 21st Street in Racine with new 9-inch concrete pavement (WisDOT 2703-06-70); a median concrete barrier wall on I-90/I-94 in Madison involving 72,000 linear feet of barrier and 28,000 cubic yards of excavation (1010-00-75); the Portage Road and Buckeye Road bridge overpasses on I-39 using about 975 cubic yards of concrete (1010-01-72, 1010-01-76); and construction engineering staff for the $13 million Todd Drive Interchange and South Madison Beltline reconstruction in 2006 and 2007 (1206-06-74, 1206-06-75).

Reference Sources

Technical references last verified November 2, 2026 by: CSG.